Skip to content

HISTORY

Brian Lehnen edited this page Apr 9, 2026 · 10 revisions

Shipyard History

2026-04-08 — Phase 5 Complete (ALL PHASES DONE)

  • Status: complete
  • Phase: 5
  • Message: MigrationGuide.md (156 lines), DashboardDocker.md (128 lines) created. Sidebar finalized. Consistency pass clean — 0 stale references, 0 broken links, 0 remaining typos.

2026-04-08 — Phase 5 Planned

  • Status: planned
  • Phase: 5
  • Message: 2 plans across 2 waves. Prior phases thorough — only 1 typo remains.
  • Plans: Plan 01 (MigrationGuide + DashboardDocker + Sidebar), Plan 02 (Consistency pass + verification)

2026-04-08 — Phase 4 Complete

  • Status: complete
  • Phase: 4
  • Message: All 3 plans built and verified PASS
  • Results: Trace.md expanded from 4 to 100 lines, Scheduler.md fully migrated to Cronos cron, 6 security caveats added, new JobScheduler.md (112 lines) and Monitoring.md (86 lines) created, sidebar updated

2026-04-08 — Phase 4 Planned

  • Status: planned
  • Phase: 4
  • Message: 3 plans across 3 waves, verified CONDITIONALLY PASS
  • Plans: Plan 01 (Observability + Message pages), Plan 02 (Scheduler + JobScheduler.md), Plan 03 (Dashboard security + Monitoring.md + Sidebar)

2026-04-08 — Phase 3 Complete

  • Status: complete
  • Phase: 3
  • Message: All 7 plans built and verified PASS. 16 transport pages updated.
  • Results: Transports.md rewritten, 5 Options pages fully expanded, all logging fixed, all typos corrected, MessageHistory + ConsumerMethod cross-refs added to all transport pages

2026-04-08 — Phase 3 Planned

  • Status: planned
  • Phase: 3
  • Message: 7 plans across 2 waves, verified READY
  • Plans: Plan 01 (Transports.md overview), Plans 02-07 (SQL Server, Redis, PostgreSQL, SQLite, LiteDb, Memory — parallel)
  • Critique: READY — all files exist, no wave conflicts, all 8 success criteria covered

2026-04-08 — Phase 2 Complete

  • Status: complete
  • Phase: 2
  • Message: All 3 waves built, reviewed, verified PASS. Security audit PASS.
  • Results: PLAN-1.1 PASS, PLAN-2.1 PASS (1 retry for title fix), PLAN-3.1 PASS
  • Pages updated: _Sidebar.md, Home.md, Usage.md, Consumer.md, ConsumerAsync.md, ConsumerAsyncWorkGroup.md, WorkerConfiguration.md, TaskSchedulerConfiguration.md, ProducerConfiguration.md, ConsumerConfiguration.md, ConsumerAsyncConfiguration.md
  • Pages created: ProducerMethod.md, ConsumerMethod.md, ConsumerMethodAsync.md
  • Pages deleted: ProducerLinq.md, ConsumerLinq.md, ConsumerLinqAsync.md

2026-04-08 — Phase 2 Planned

  • Status: planned
  • Phase: 2
  • Message: 3 plans across 3 waves, verified READY
  • Plans: PLAN-1.1 (Sidebar/Home/Usage), PLAN-2.1 (Consumer fixes + Linq→Method renames), PLAN-3.1 (Configuration + supporting pages)
  • Critique: READY — all files exist, no same-wave conflicts, all 7 success criteria covered

2026-04-08 — Brainstorming Complete

  • Status: ready
  • Phase: 2
  • Message: Project definition and 5-phase roadmap captured and approved
  • Decisions: Full wiki sync (option A), hybrid code samples (inline + samples repo links), rename Linq→Method pages, keep existing dashboard page structure + add Docker page, expand MessageHistory into cross-referenced section, add migration guide, add JobScheduler and Monitoring pages, created GitHub issue #112 for dashboard screenshots
  • Roadmap: 5 phases — Phase 1 audit (done), Phase 2 core usage, Phase 3 transports, Phase 4 observability/scheduler/dashboard, Phase 5 new pages + polish. Phases 3/4 parallelizable.

2026-03-28 — Initialization

  • Status: ready
  • Phase: 1
  • Message: Project initialized
  • Settings: interactive mode, manual git, detailed review, security audit enabled, simplification enabled, IaC auto, docs generation enabled, default model routing, auto context

Clone this wiki locally